Public Infrastructure Questions
Description
Unformatted Attachment Preview
Instructions
The assignment itself is basically what inside the below box. All the information outside the box is
general guidelines and instructions that are needed to complete the assignment .
Assignment:
Problem:
1. Identify a major public infrastructure project that is either underway,
complete, or proposed in your region. This could be a bridge, road,
building, or something of that nature. For the project you have identified,
think of as many stakeholders and stakeholder groups as you can. Create a
three-column table. In column 1, list the stakeholders. In column 2, list what
each stakeholder wants to get from the project. In column 3, list the
influence each stakeholder has over the project.
Reading Materials:
he above problem is related to the reading in Chapter 5 in the book. The same problem is in
Page 197 under ppendix 2: Chapter Questions
Chapter 5 in the textbook 2oject Management2nd Edition. 2014
ISBN: 978-1-77420-013-1
Author: Adrienne Watt
Chapter 5: Stakeholder Management
ou can access the book for FREE in this link https://opentextbc.ca/projectmanagement
Guidelines:
lease answer the questions directly. No need for an introduction or conclusion.
lease FULLY answer all the questions.
lease ensure to cite and reference your answers
rovide the page numbers along with in-text Citation.
Example: (Jones, 2018, p.201)
Purchase answer to see full
attachment
Have a similar assignment? "Place an order for your assignment and have exceptional work written by our team of experts, guaranteeing you A results."