develop the system implementation plan document. This document will include the engineering, furnishing, and installation (EFI) technical aspects of your e-commerce company’s information systems infrastructure. This assignment consists of two parts:
- Part 1: System Implementation Document
You will create an 8p page system implementation document that details the engineering, furnishing, and installation (EFI) technical aspects of your e-commerce companyænbsp;information systems infrastructure.
- Part 2: Updated Gantt Chart
You will use Microsoft Project to once again update the supporting project Gantt chart begun in your first course project deliverable.
You are not creating a new Gantt chart, only updating the one you created in the previous assignment with the major and minor tasks uncovered while creating the system implementation document.
Note:
You are to create or assume all necessary assumptions to successfully complete this assignment.
You must submit both parts as separate files to the assignment area. Label each file name according to the appropriate part.
Instructions
Part 1: System Implementation Document
You are to write an 8p page system implementation document in which you:
- Use graphics tools to design the logical and physical layout of the planned e-commerce company’s information systems.
Use graphics tools to illustrate the possible placement of key infrastructure elements with external connectivity (Internet) and internal connectivity (firewalls, LAN).
Develop the bill of materials and tabulate it in a spreadsheet to include item, description, model number, and approximate cost.
Document the methodology and process to include the engineering, furnishing, and installation of the identified inventory.
Use three sources to support your writing. (Choose sources that are credible, relevant, and appropriate. Cite each source listed on your source page at least one time within your assignment. Access the library or review library guides for help with research, writing, and citation.)
- Part 2: Updated Gantt Chart
- Use Microsoft Project to:
Update the previously created Gantt chart with the major and minor tasks identified in the system implementation document.
Week 8 Discussion- 5 Paragraphs
What are the key considerations when developing an information system for a global enterprise? Have you heard of the follow-the-sun model of support? What are the benefits and challenges of such a model?
What are the major challenges posed by the global information systems? Choose one challenge and identify a solution to overcome that challenge. Feel free to use industry examples in your discussion.
Have a similar assignment? "Place an order for your assignment and have exceptional work written by our team of experts, guaranteeing you A results."